Business
Abuja Braces for Seven-Hour Power Blackout
Residents of Nigeria's capital, Abuja, face a scheduled seven-hour power outage this Saturday. The Transmission Company of Nigeria (TCN) has announced preventive maintenance at a key substation. The disruption spotlights ongoing infrastructure challenges in Africa's largest economy.
Tribune Online·July 4, 2026AI-curated

The Transmission Company of Nigeria (TCN), Abuja Region, has announced a scheduled preventive maintenance at the Katampe 132/33 Kilovolt (kV) Transmission Substation. This maintenance will take place on Saturday from 9:00 AM to 4:00 PM. Mrs. Ndidi Mbah, TCN’s General Manager of P
nigeriaabujapower outageinfrastructuretcn
This story was sourced from Tribune Online and rewritten in SEVA editorial voice. Read the full original at the source.
